It’s been a while but finally the power has been connected and we have light.
The next step is for the building inspector to sign-off the build so far. POSH then have to complete the following:
- Finish trim between ceiling and roof
- Change guttering to white
- Remove existing door, fix plaster and skirting (followed by me painting it)
- Change locks for a matched pair
Hopefully this will be done by Friday 1st August as Downs carpets are booked to lay a new carpet. I’ve then got a busy few weeks (or maybe months) installing new internal doors and laying a new patio.